Access control is a top priority for TEXA. Keys are easily lost and pose a security risk. A total of five doors—both indoors and outdoors—were identified as needing to be secured. Four of these were equipped with the CX2172 and CX2174 electronic door handles from hardware partner Datafox. Since these devices communicate wirelessly, no cabling is required. At the same time, an RFID reader is integrated to verify access authorization. This is made possible by time profiles that the HR manager manages centrally in the ACCENON software.
The main entrance presented a special challenge, as time tracking and access control converge there. Together with ACCENON, the right solution was found. Employee clock-ins are recorded via the Datafox EVO 4.3 multifunction terminal. Since the device is wired to the electronic door opener, access authorization is verified simultaneously. Both processes are carried out using a single RFID chip.
Once the project implementation could begin, ACCENON’s project management team contacted Mr. Greco, the project manager at TEXA. The purpose of the meeting was to coordinate the schedules for the individual services—from the initial installation and training sessions to the go-live and rollout of ACCENON’s software.
Following the server installation, the ACCENON consultant conducted the initial time-tracking training on-site in Langenbrettach. The training covered master data maintenance and the creation of time models. Initial settings were already implemented on the live system.
In the meantime, the network data required for configuring the time and access terminals was gathered. Furthermore, TEXA decided to give the two time-tracking terminals a custom look. The layout, designed in-house, was applied to the glass surface in collaboration with Datafox. As a result, the two time-tracking terminals now feature the company’s own branding.
After the hardware was set up and shipped, the customer handled the installation. The service team connected the terminals to the ACCENON software via TeamViewer. The devices were now operational, and the first clock-ins were recorded. A brief test phase followed, during which the primary focus was on movement data. Thanks to the time and access logs, the first live data is now in the system. A second meeting was held at TEXA’s offices to make corrections to the movement data and clarify any remaining questions.
Nothing stood in the way of the go-live. The ACCENON software went live in production, and the implementation was successfully completed.