Zur Hauptnavigation springen Zum Inhalt springen

Case Study: Josef Wiegand GmbH & Co. KG Real-Time Data for Leisure Fun

Few people are likely familiar with Josef Wiegand GmbH & Co. KG, based in Rasdorf, Hesse—even though millions of people worldwide have been using this medium-sized company’s products for five decades. The product portfolio of this technology and global market leader includes rides and slides for both indoor and outdoor use. In addition to the bestseller, the rail-guided, year-round “Alpine Coaster,” ranging from the classic trough-style summer toboggan run to the electrically powered Bobkart and the “Hexenbesen” and “Wie-Flyer,” Wiegand’s dry and water slides also enhance the offerings at numerous tourist attractions.

This “hidden champion” from the Rhön region employs around 600 people worldwide, including approximately 40 installers who travel around the globe to set up the attractions. However, the company also operates numerous attractions in Germany and Europe itself. Examples include the amusement parks on the Wasserkuppe in the Rhön and on the Inselsberg in the Thuringian Forest, where visitors can experience the full range of innovative rides and slides.

As early as 2005, the first Datafox PZE-Master IV time-recording terminal was installed as part of a new time management software system. In 2010, new production control software was introduced, and time management was integrated into the ERP system. The software and vendors changed—but the Datafox hardware remained in place and was supplemented by industrial PCs for manufacturing. Since then, both labor hours and production times have been recorded.

With every software update or change, Datafox was the preferred choice as the hardware manufacturer.

In 2015, it became necessary to further modernize the time-tracking system. Based on our positive experience with Datafox, we invested in new time-tracking devices for all our locations. This allows us to operate more independently, and all employees’ time data is once again tracked in a single system. Within a year, all locations were up to date. Since then, the workload and downtime have been significantly reduced.

With every software update or change, Datafox was the preferred choice as the hardware manufacturer. The advantages are clear: the geographical proximity—only a few kilometers separate Geisa and Rasdorf—is just one of them. In particular, the devices’ ease of use, robustness, and the weather resistance of the time-recording terminals installed outdoors have been impressive for many years. Remote locations where neither internet access nor cabling was possible were easily connected via cellular communication.

Thanks to some custom programming by a Datafox partner, approximately 600 employees across 9 different companies at 13 locations can now work with various shift and schedule arrangements. Data transfer and synchronization occur automatically. Since the introduction of time tracking, cost calculations have become much more precise and payroll processing has become simpler. Because all hardware comes from a single source, employees can use the same transponder chip to open doors, disarm the alarm system, and record their wages and production time.

Transparency in production has improved significantly. It is possible to determine at any time which employee is working on which project. This allows future projects to be planned and scheduled much more effectively. Productivity increases, output rises, and projects are completed on time.

Further digitization will accelerate, simplify, and improve work at Wiegand. Datafox also plays a major role in this.

Currently, the company is using

  • 21 industrial PCs,
  • 22 time-tracking terminals, and
  • access control systems at 4 doors.

The devices operate 24 hours a day, 7 days a week. Robustness and durability are therefore essential. In the event of a network outage, the data is also stored on the device and is not lost.

 

Related Files

pdf | Datafox Customer Magazine 2019
Published in the Datafox customer magazine *erfasst!* in 2019
6 MB

Hardware Used in the Project